Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

which act stated that parliament did have right to tax colonist
48 gallons in 14 minutes write rate as a fraction
what is it called when the species change over time
An isosceles triangle has a perimeter of 8.5 cm. A second isosceles triangle, whose base is equal to that of the first but whose legs are twice as long of the f
what do we call a part of the body with a special function?
Explain Each Part please!!! The cost C, in dollars , of building a concrete sidewalk varies directly with its lentgh , s, in meters A.. find an equat
Your congresswoman supports wealthy Americans paying a greater percentage of their income in taxes than those who are less wealthy. She would most likely suppor
What is the relationship between succession and climax vegetation?
Plants transform some of the electromagnetic energy from the sun into what?
624 feet to 702 feet