If it takes 100 minutes to complete a circuit, demand at the next work center is 5 parts per minute, and a kanban container holds 20 parts, how many containers are required?

Respuesta :

miamonroe56
miamonroe56 miamonroe56
  • 02-06-2017
5 times 100 = 500
500 divided by 20 = 25
25 containers
Answer Link

Otras preguntas

What is the powerhouse of a cell?
Discuss three contributing factors that lead to a gender-based violence ​
Help please hurry NO LINKS!!! Special Right Triangles (Radical Answers)
Please help me it’s so important :(((
Neil is very nervous during his job interview. The interviewer asks him questions and Neil answers them without looking up. What impression might this give the
Distribute and simplify the following: (5m + 6)(m – 7) (5m + 6)(m – 7) =
3/14 - 1/7 in simplest form
What fraction is at point A on the number line below? А ++ 0 + 1 Use the number pad to enter your answers in the boxes.​
Help me pls At an ice carving competition, each carver starts with a block of ice with the dimensions shown. The block is wrapped in a special reflective materi
Which of the following techniques can you not use to make the members of the std namespace available to your code? a. Code a using directive for the namespace