victorharrell2003
victorharrell2003 victorharrell2003
  • 01-05-2021
  • Computers and Technology
contestada

PLEEASE ANWER QUICK: The project manager is writing the requirements document. Which phase of the project life cycle is he in?
project closure
project planning
project initiation
project execution ​

Respuesta :

Animmango
Animmango Animmango
  • 01-05-2021

Answer:

I think, project execution. He is writing the requirements document. which mean it doesn't project closure and initiation. then he did it which mean it doesn't project planning.

Answer Link

Otras preguntas

The values of trigonometric functions at multiples of 45 degrees are based on components of _____. a. equilateral triangles b. isosceles triangles c. isosceles
Find the measure of JK that makes Triangle JLK- triangle PLM
The strength of the woodwinds section is
What race are Hispanic​ people?
which graph represents the function(x)=1/x=1
What is being studied in a monohybrid cross? the genetics of parthenogenesis only one genetic trait the genetics of a self-fertilizing species t
What did the encomienda system, established by the spanish crown, allow spaniards to do?
Which of these children's blood type could NOT be produced by parents with type A and type O blood types? Type O Type A Type AB all of these are
The strength of the woodwinds section is
This act gave free plots of land to people who agreed to build upon it and farm on it.