medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Please help!! I will give brainliest :)
Jake is saving for a new tablet. It costs $250, and he has $100. He earns $5 per week for doing chores. Jake wants to figure out how many weeks it will take for
what is the intial value of the function f(x)=3{5/4}^x
How does sherlock holmes discover about the hound of the baskervilles
Carson’s class visited a hydroelectric plant on a field trip during their study of energy. The process interested him, and he had the chance to observe it in ac
Which equation represents the graphed function? -3x + 2 = y -2/3x+2=y 3/2x-3=y 2x-3 = y
A chemical supply company sells sulfuric acid (h2so4) in a concentration of 4. 00 m. What volume of this solution would you need to make 12. 0 ml of a 0. 50 m h
If a company saw an online photo of you playing basketball, it might try to sell you: A. music CDs. B. pet food. C. high-top sneakers. O D. a baseball mitt. ВМІ
The temperature in Toronto was 14 F. The temperature that same night fell to -5 F. What was the difference in temperatures? A.) 9 degrees B.) 11 degrees C.) 19
34,678 rounded to the nearest hundred.