Ahmatsuper Ahmatsuper
  • 01-02-2021
  • Mathematics
contestada

A construction company can remove 25,200 pounds of dirt from a construction site in 8 hours.

Respuesta :

1726890 1726890
  • 02-02-2021

Answer:

yes they can how efficient

Step-by-step explanation:

Answer Link

Otras preguntas

Why do you need to draw a circle around each seismograph center, using the distance to the epicenter as the radius?
Is this expression x+2x+3 equivalent to the expression 3(x+1)
Two thirds Of a number Is 3 1/2 ( three And a half) more than three eighths Of The number. Find The number.
Elena has 22 coins that equal$3.85. What are the coins? My lil sis needs help with this please help. Thank you
Ed bought a bottle of fancy mustard that holds 8.5 ounces .ed puts about 1/25 of mustard on each hot dog he eats.how much of the mustard is left in the Boyle af
Which environmental program protects the supply of groundwater? Caribbean Planning for the Adaptation of Climate Change PPG 7 Pilot Project in Brazil South Amer
16.686 rounded to the nearest hundredth
suppose there are 20 questions on a multiple-choice test. if 25% of the answers are choice B,how many of the answers are NOT choice B ?
For the first 11 years of its existence, which governmental system did the United States use? a. monarchy b. confederation c. federation d. theocracy
if M (-4,5) is reflected over the line y=x, what are its new coordinates?