wahab8679 wahab8679
  • 02-03-2020
  • Business
contestada

The project management plan can be composed of one or more of the __________ subsidiary plans a. Cost management b. Schedule management plan c. Project scope management plan d. All of the above

Respuesta :

lilmoma0311p4iph8
lilmoma0311p4iph8 lilmoma0311p4iph8
  • 03-03-2020

Answer:

cost management or schedule management plan

Answer Link

Otras preguntas

How did the development of farming change the lives of the first Americans?
Which one is it A. b. C. or D.
How does the embryo get nourishment inside the mother's body?
In a second grade class containing 12 girls and 11 boys, 2 students are selected at random to give out the math papers. what is the probability that the second
in what type of of oranigzition is sequence extremely important
what two types of waves are used to determine the epicenter of earthquakes
What else would need to be congruent to show that ABC DEF by ASA?
How many solutions does this system have? y = 5x + 6 y – 5x = 7 A. no solutions B. 1 solution C. 2 solutions D. infinitely many solutions
Who says the following and why? "Don't rove from home too long, too far, leaving your own holdings unprotected— crowds in your palace so brazen they'll carve u
Write an expression showing 8 less than a number,t