billiejochaplin2541 billiejochaplin2541
  • 02-11-2019
  • Mathematics
contestada

A homeowner estimates that it will take her 7 days to roof her house. A professional roofer estimates that he could roof the house in 4 days. How long will it take if the homeowner helps the roofer?

Respuesta :

skinnylandia2
skinnylandia2 skinnylandia2
  • 02-11-2019
3 days 7-4=3
hope i helped
Answer Link
hamadaso95 hamadaso95
  • 02-11-2019

Answer:

fk u

Step-by-step explanation:

7=8

Answer Link

Otras preguntas

56 out of 128 students went on a trip during vacations what percent of students went on trips
what is the meaning of of the phrase hideous cruelty
Describe what happens to the graph of y=3x+4 when the slope is changed to 1/3
An analysis of an oxide of nitrogen with a molecular weight of 92.02 amu gave 69.57% oxygen and 30.43% nitrogen. What are the empirical and molecular formulas f
The first civilizations in Asia formed along the _____ and ____ River valleys around _____ BC. A. Indus; Yangtze; 6000 B. Indus; Yellow; 3000 C. Indus; Yellow;
what is the decimal 1.38 equal as a mixed number?
What is the mass in grams of 1.73 moles CaH2
Why is external criticism so important when it comes to analyzing data?
Who is Governer of FL?
I need help factoring!