Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

please solve this please​
The assertion that non formal institution have no role to play in the processing stage of the system theory is an empty rhetoric
GIS software produces blank representations of blank
If an experiment calls for 0.200mole acetic acid (Hc2H3O2)how many grams of glacial acetic acid do we need?
How do we aquire knowledge in science?
1Dyne = How many Newtons??​
Last year, Rob set up the Road Runner Race for his school. The race was 1,200 meters long and 188 people signed up to run the race. 38 people did not show up to
Please help explanation if possible
if i traveled 35 miles on his bike in 3.5 hours what is his rate of speed? i rlly need help- m not sure how to do the steps or whatever
which of the following portions are true A. 20/48 = 40/90 B. 25/40 = 48/80 C. 18/48 = 27/72 D. 12/15 = 21/25