liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

MathematicalUse Number Sense Duane and Mick are savingtheir money to build a tree house. Duane adds $5 to their piggybank every other week. Mick adds $2 every w
Which statement is true about the language that the author uses in City? A. The author includes technical terms that are specific to the field of architecture.
Which pair of measurements is not equivalent? 24 feet, 8 yards 24 inches, 2 feet 10 feet, 120 inches 3 miles, 15,480 feet
The mass of one liter of water is about one ____ A : Milligram B : Kilogram C : Gram
What is the perimeter of a hexagon that has equal sides of 12 inches ? A . 60 inches B. 66 inches C. 72 inches D . 84 inches
Judd worked 40 hours this week. He worked 7/10 of the hours outside and the rest inside. How many hours did he work outside? 35 28 12 8
Why might cations be followed by Roman numerals
You roll a standard number cube. Find P(odd). A) 5/6 B) 1/3 C) 2/3 D) 1/2
Which city was an Axis capital during the Second World War? A. Lisbon B. Canberra C. Tokyo D. Ankara
"Proper" tragedies may have a main character from everyday life, such as a farmer