Determine the amount of work done when a crane lifts a 100-N block form 2m above the ground to 6m above the ground

Respuesta :

hrzlatevski
hrzlatevski hrzlatevski
  • 03-02-2019

Data given:

F=100N

Δx=6m-2m=4m

A=?

Formula needed:

A=F×s

Solution:

A=100N×4m

A=400J

Answer Link

Otras preguntas

what day does the act of romeo and juliet end in act 3
Suppose that $2000 is invested at a rate of 2.1% compounded annually. Assuming that no withdrawals are made find the total amount after 5 years. Do not round an
The ________ is a microtubule structure that binds to sister chromatids to separate them in anaphase
Decide la ubicación de cada adjetivo según el significado. Hay una fortaleza en Viejo San Juan.
Please Help Which colony was influenced by Pennsylvania's size and location? A. New Jersey B. Florida C. Virginia D. Massachusetts
If a person is chastised, he has been _____.
(a-1)*(a+1) How does the expansion of this thing works?
what is the vertex for re parabola y = -2 (x-3)^2+4
¿Cuántos boletos necesito comprar para entrar? souvenirs tickets lakes theaters
Which of the following measures can be determined by analyzing a dot plot? Select all that apply. range median mode mean